Dents 8 are a leading smart repair and dent removal
specialist with centres across the UK. In the many years of
trading they have built a fantastic reputation by providing
a high quality local service backed up by a nationally
recognised brand.
Having had a Dalby booth installed back in 2009 Dents 8
had no hesitation in contacting us again for another booth
to cope with the high demands of their growing volume of
business. After consultation with Dalby, our expert sales
team guided them through the process of getting a new
booth installed.
The Easy Booth was tailored to suit the clients
requirements perfectly with an extended height and
length configuration to cope with larger vehicles, a
specially designed Aqua-Dry system to assist with a faster
more energy efficient process cycle, led lighting, and
cosmetic paneling making the booth look every bit as
modern and cutting edge as the technology that drives it.
Dalby carried out a full turnkey installation including all gas
work, electrics, compressed air and roof work. Carefully
coordinating the works through our contracts team we
completed the install quickly and efficiently avoiding
downtime for the client.
Our innovative design allows access to the plant internally
through the rear wall of the cabin, allowing the booth to
be fitted tight against adjacent walls saving the client
valuable workshop space.
Bev Vaudrey of Dents 8 commented “Having Dalby take
care of the whole process including installation, gas
connections & electrical work made it all so simple & the
schedule went according to plan. The whole team at Dalby
were professional, friendly, helpful & informative. The booth
looks great and the Dalby Aqua-Dry system is proving
invaluable, so much so that we have now placed an order to
have the original booth upgraded.
Thanks to the whole team at Dalby!”